Welcome to the,

Treasure Valley Trail

Machine Association


  • Home
  • High Creek Work Weekend

TVTMA Sponsors

                

          


High Creek Work Weekend

  • 01 Jul 2017
  • 8:30 AM
  • 03 Jul 2017
  • High Creek Area



High Creek Work Weekend, July 1-3rd

In preparation for the State Ride, we are going to have a 3 day work weekend to focus on getting trails cleared and ready for the state ride.  Brian King will be hosting/coordinating this event.  The plan is to stage (camp and ride) out of High Creek Area(Methodist Camp).  High Creek(Methodist Camp) is easy to get to (25ish miles north of Fairfield), and has a great place to camp.  Trails are varied and include many “easier” trails to accommodate all skill levels.  This is a work project, so plan on packing a saw or trail tool on the trail(log throwers are needed also if you’re not comfortable riding with a tool).  Please pack a lunch/snacks; dinner Saturday and Sunday will be provided.  Please RSVP so enough lobster and soufflé can be prepared.

Rider Meeting each day at 9-9:15.  Hit the trail around 9:30.

Directions: 84 to Mt. Home, head towards Fairfield on Hwy 20.  From Highway 20, turn left and go North on Soldier Creek Rd. NF-Road 094 for 18.4 miles.
At Little Smoky Campground veer left (north) on NF-Road 227 for 5.6 miles.
At four-way intersection, keep north on NF-Road 012 for 6.9 miles.
Cross bridge veer right on NF-Road 079 for 1.3 miles to camp.


Please RSVP to brianking2000@gmail.com

Treasure Valley Trail Machine Association "TVTMA"  P.O. Box 140162, Boise, ID 83714

Powered by Wild Apricot Membership Software